Completed • Civil
MIDC Chemical Plant Expansion
Designed and poured massive RCC structures with acid-proof flooring.
Ongoing • Engineering
Boiler System Overhaul
Complete structural and pipeline NDT check and refurbishment.
Case Study • Maintenance
Factory Floor Refinishing
Before & After: Complete sandblasting and heavy-duty epoxy coating applied.